Close Overlay
Welding & Preservation

Welding & Preservation

Projects Hyperbaric Preservation


Wendefurth Dam


The Wendefurth Dam in the Eastern Harz region is 43 metres high and seals the Bodetal dam system. It is the only plant in this system which is not used for the provision of drinking water. Its main task lies in controlling floods in the Wendefurth Dam with a total capacity of 8.5 million m³.  read more »

Witznitz Reservoir


In order to safeguard the supply of untreated water for the Thierbach hydraulic power station (which will soon be replaced by the new Lippendorf hydraulic power station), 2 suction lines (NW1200) with a strainer run into the Witznitz Reservoir. The strainer is 207 metres distance from the pump plant.  read more »